High performance steel wire ropes for offshore installation vessel applications.

Header EF

Offshore Installation Vessels

The increased demand in offshore wind installations combined with larger capacity turbines will provide major challenges to the market. The scale of modern wind turbines will require longer crane booms, which will result in higher forces on the rope and drum – this can lead to potential drum crushing issues. 

The limited availability of installation vessels combined with the significantly increasing number of lifts per crane will make rope longevity critical for operational efficiency.

Experienced in offshore lifting applications

Bridon® Steel Wire Ropes by Bekaert has extensive experience in offshore lifting applications for the oil and gas industry, where safety, reliability, and performance are critical.

This deep knowledge base, developed through years of tackling complex offshore challenges, positions Bridon® Steel Wire Ropes by Bekaert as the perfect partner to solve the future challenges presented by offshore wind installation projects. 

Key differences between offshore wind and traditional oil & gas

Offshore oil and gas installations typically involve single, large lifting operations, such as placing a massive drilling platform in a fixed position. In contrast, offshore wind installations require multiple, complex lifting tasks for various components, each with unique handling requirements.

Offshore wind foundations range from fixed-bottom to floating with the most common being monopiles. Wind farms consist of numerous turbines, with each one having many interconnected parts — including foundations, towers, blades, and nacelles that must be lifted individually and precisely assembled at while offshore.

More isn't always less...

Although offshore wind farms will be made up of multiple assets compared to traditional oil & gas, this doesn't mean that they are smaller in comparison.

Wind turbines continue to scale in size leading to innovations in new dedicated wind turbine installation vessels.

Challenges for offshore wind installation vessel cranes

Enhance your offshore productivity

NEW Dyform® 8 PI MAX

  • Specifically developed to solve the challenges of offshore wind installation vessels.
  • Now possible to achieve specific rope diameters for demanding crane applications.